Connect T2 in M68EPT08Qx to T2 in M68UICS08
- Connect P2 to P5 for QT or P2 to P4 for QL or P2 to P3 QY/QB devices
- Place the MCU to U1 in M68EPT08Qx
- Make sure the J9-J13 in M68UICS08 are default setting as J9(1-2), J10(2-3), J11(1-2), J12(2-3), J13(1-2)
- Make sure J7 is default setting (9.8152MHz) J7(1-2)
- Remove short pin in J4 in M68EPT08Qx (for programming only)
- Connect RS232 cable between J2 in M68UICS08 and PC COM port
- Connect given 9Vdc power to J1 in M68UICS08
- Launch P&E Prog08sz.exe and then set as the Blank device to enter GUI and read the trim value first
(refer to QTQY_PA_User_Guide_v01_Chinese.pdf).作者: sunvin 时间: 2005-3-16 17:30 标题: M68UICS08+M68EPT08QX